Michigan DOT Pauses Work on Detroit’s $500M Freeway Corridor Makeover
Rising costs—now estimated at topping $500 million—and local opposition to the planned design have led the Michigan Dept. of Transportation to pause a project to convert Detroit’s downtown I-375 freeway into a grade-level boulevard. Last year, MDOT selected Shelby Township, Mich.-based Dan’s Excavating, Inc., for the progressive design-build contract, with pre-construction work tentatively scheduled to…

