Case study: Moving to centralized power generators with utility backup
An existing hospital campus is undergoing a master planning effort to determine strategies for growth and infrastructure improvements. The campus is currently fed from two utility sources, Circuit A and Circuit B at 13.8 kilovolts (kV). The two sources serve 15-kV switchgear that distributes power throughout the campus through underground duct banks with taps made…