Magazine

FM College ~ News & Articles

Construction Kicks Off on Health First Cape Canaveral Replacement Hospital

Mar 27, 2024 | Public | 0 comments

The new replacement hospital was designed by Lawrence Group architects.

Construction has officially kicked-off on a $410 million Health First Cape Canaveral replacement hospital, parking garage and medical office building in Merritt Island, Florida, designed by Lawrence Group architects.

The new 120-bed hospital, three-deck parking structure and 92,000-square-foot medical office building will replace Health First’s Cape Canaveral Hospital in Cocoa Beach, as part of its new campus.

Health First announced plans to open its new hospital and medical office building in early 2027, at which time the original Cape Canaveral Hospital would be closed. Gilbane Building Company is the general contractor on the project. Headquartered in St. Louis, Lawrence Group’s Florida office will provide local support to ensure that the project runs seamlessly and is completed on time and within budget.

The 268,000-square-foot replacement hospital is being built on a 14-acre site, four miles inland from the original Cape Canaveral Hospital located on reclaimed land in the Banana River. Constructed in the 1960s, the six-story, 150-bed hospital was targeted for replacement, in part, due to its vulnerability to hurricanes and risk of flooding.

To protect the new hospital from flooding during storm surges, Lawrence Group designed its ground floor 13 feet above sea level, and its exterior envelope and structure over and above code requirements to withstand a Category 4 hurricane. Additionally, the campus will be served by an on-site central energy plant, built to ensure continuous power function even during tropical storms and hurricanes.

Incorporating the latest in patient-centered healthcare design, Lawrence Group planned the new hospital with 120 inpatient beds, 25 emergency department treatment bays and six operating suites. Lawrence Group also designed the three-story medical office building for specialty services, as well as the campus’ parking garage and lot.

Extensive landscaping designed by Lawrence Group allows the new hospital and medical office building to integrate seamlessly into its existing environment, while providing room for greenspace, a half-mile walking trail and other connections to nature throughout the new campus.

The post "Construction Kicks Off on Health First Cape Canaveral Replacement Hospital" appeared first on Healthcare Facilities Today

0 Comments

Submit a Comment

Fed invests in Montreal mixed-use property

The federal government is allocating $50 million towards the construction of The MileBrook, a mixed-use development...

2025 restroom trends you can count on

Each year, leaders in the fashion, building design, construction, and home design predict upcoming trends. While these...

A Guide to Smart Budgeting for Facilities Managers

The many strands of facilities management across property, buildings, and operational assets require professionals to take...

AI and FM: Insights from the Front Lines

Standford Medicine’s facilities management team discusses the opportunities for and challenges of its efforts to apply AI...

Chippewa Valley Health Cooperative to Build Nonprofit Hospital in Lake Hallie

The facility is projected to open in fall 2027. The Chippewa Valley Health Cooperative is building a full-service,...