Breakout Area

Informal spaces for short meetings, socializing, or alternative work settings.

Building Envelope

The physical separator between the interior and exterior of a building, including walls, floors, roofs, windows, and doors.

Building Information Modeling (BIM)

An intelligent 3D model-based process that gives architecture, engineering, and construction professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure.

Building Management System (BMS)

A computer-based control system installed in buildings that controls and monitors the building’s mechanical and electrical equipment.

Building-Related Illness (BRI)

A diagnosable illness with identifiable symptoms that can be directly attributed to airborne building contaminants.

Business Continuity Management

A holistic management process that identifies potential threats to an organization and the impacts to business operations those threats, if realized, might cause.

Business Impact Analysis

A process that identifies and evaluates the potential effects of an interruption to critical business operations as a result of a disaster, accident or emergency.

CAFM

Computer-Aided Facility Management

Carpal Tunnel Syndrome

A condition that causes numbness, tingling and other symptoms in the hand and arm due to a compressed nerve in the carpal tunnel.

Cascading Objectives

The process of translating high-level strategic objectives into more specific, actionable goals and targets at each level of the organization, from the executive team down to individual contributors.