- Absenteeism
- Access Control
- Access Control System
- Accessibility
- Accessibility Standards
- Accountability Systems
- Active Design
- Active Listening
- Active Workstation
- Activity-Based Working (ABW)
- ADA (Americans with Disabilities Act)
- ADA Standards for Accessible Design
- Adjustable Workstation
- Agile Project Management
- Agile Working
- AHU (Air Handling Unit)
- Air Quality Management
- Alarm Systems
- Anthropometrics
- Artifacts
- As-Built Documentation
- ASHRAE
- ASHRAE 90.1
- Aspirational Language
- Aspirational Values
- Asset Lifecycle Management
- Asset Management
- Asset Tracking
- Assumptions
- ASTM E1557
- ASTM E2018
- Authentic Values
- Authenticity
- Automated Controls
- Balanced Scorecard
- BAS (Building Automation System)
- Baseline
- Baseline Schedule
- Behavioral Coaching
- Benchmarking
- Best Practices
- Bid Bond
- Bill of Quantities (BOQ)
- BIM (Building Information Modeling)
- Biophilia
- Biophilic Design
- Blockchain Technology
- Blue Ocean Strategy
- BOMA (Building Owners and Managers Association)
- BOMI (Building Owners and Managers Institute)
- Bottom-Up Estimating
- Breakout Area
- BREEAM (Building Research Establishment Environmental Assessment Method)
- Budget Contingency
- Budget Development
- Budget Overrun
- Budget Variance Analysis
- Buildability Analysis
- Building Automation System (BAS)
- Building Codes
- Building Commissioning
- Building Envelope
- Building Envelope
- Building Information Modeling (BIM)
- Building Management System (BMS)
- Building Performance Standards
- Building Systems
- Building-Related Illness (BRI)
- Business Case Development
- Business Continuity Management
- Business Continuity Planning
- Business Impact Analysis
- Business Intelligence Software
- Buyout Phase
- CAA (Clean Air Act)
- CAFM (Computer-Aided Facilities Management)
- Capital Expenditure (CapEx)
- Capital Planning
- Carbon Dioxide (CO2) Monitoring
- Carbon Footprint
- Carbon Neutrality
- Carpal Tunnel Syndrome
- Cascading Objectives
- Cash Flow Forecasting
- Catchball
- CEU (Continuing Education Units)
- CFM (Certified Facility Manager)
- Change Agents
- Change Communication
- Change Control Process
- Change Leadership
- Change Management
- Change Order
- Change Order Management
- Change Readiness Assessment
- Change Resistance
- Chiller
- Churn Rate
- CIOB (Chartered Institute of Building)
- Circadian Lighting
- Clash Detection
- Climate Resilience
- Closeout Documentation
- Closeout Report
- CMMS (Computerized Maintenance Management System)
- Coaching Culture
- Collaborative Space
- Color Rendering Index (CRI)
- Commissioning
- Commissioning (Cx)
- Commissioning Authority
- Competitive Advantage
- Competitive Bidding
- Compliance Audit
- Compliance Management
- Computer-Aided Facility Management (CAFM)
- Computerized Maintenance Management System (CMMS)
- Conceptual Estimate
- Condition Assessment
- Conflict De-escalation
- Conflict Mapping
- Constructability Review
- Construction Administration
- Construction Contingency
- Construction Documentation
- Construction Documents
- Construction Management
- Constructive Feedback
- Continuous Improvement
- Contract Administration
- Contract Closeout
- Core Competencies
- Core Values
- Corporate Social Responsibility (CSR)
- Corrective Action Plans
- Corrective Maintenance
- Correlated Color Temperature (CCT)
- Cost Baseline
- Cost Breakdown Structure (CBS)
- Cost Estimating
- Cost-Benefit Analysis
- Counterculture
- CPM (Certified Property Manager)
- CPM (Critical Path Method)
- Crisis Management
- Critical Chain Method (CCM)
- Critical Chain Project Management
- Critical Path Method (CPM)
- Cross-Training
- Cultural assessment
- Cultural audit
- Culture
- Customer Service Excellence
- Cut and Fill
- CWA (Clean Water Act)
- Daily Report
- Dashboard Tools
- Data Analytics
- Data Management
- Decision Framework
- Decision Trees
- Defect Liability Period (DLP)
- Deferred Maintenance
- Delay Analysis
- Deliverables
- Demand Response
- Demand-Controlled Ventilation
- Design Intent
- Design-Bid-Build (DBB)
- Design-Build (DB)
- Development Planning
- Deviation Report
- Digital Transformation
- Digital Twin
- Disaster Recovery Plan
- Dispute Resolution Board (DRB)
- Disruptive Innovation
- Diversification
- Downtime
- Draw Request
- Due Diligence
- Earned Schedule (ES)
- Earned Value (EV)
- Earned Value Management
- Economic Life
- Emergency Preparedness
- Emergency Response Plan
- Emotional Intelligence
- Employee Engagement
- Empowerment
- Energy Audit
- Energy Benchmarking
- Energy Efficiency
- Energy Management Systems
- Energy Modeling
- Energy Star
- Environmental Compliance
- Environmental Impact Assessment (EIA)
- Environmental Management System
- Environmental Regulations
- Environmental sustainability
- Equipment Lifecycle Management
- Equipment Utilization Rate
- Ergonomic Assessment
- Ergonomic Risk Factors
- Ergonomics
- Escalation Clause
- Escalation Procedures
- Escrow Account
- Espoused values
- Ethics Code
- Evacuation Planning
- Expected Monetary Value (EMV)
- Facilities Maintenance
- Facility Assessment
- Facility Condition Assessment (FCA)
- Facility Condition Index (FCI)
- Facility Management
- Facility Management Professional
- Fast-Tracking
- Feasibility Study
- Feathering Delay
- Feedback Culture
- Field Order
- Final Inspection
- Financial Analysis
- Fire Protection Systems
- Fire Rating
- Fire Safety System
- Flexible Seating
- Float Path
- FMP (Facility Management Professional)
- Foot-candle
- Force Account Work
- Foreman’s Daily Log
- Front-End Planning
- Functional Performance Testing (FPT)
- Functional Programming
- Handover Package
- Hard Costs
- Hazardous Materials (HAZMAT)
- Hazardous Materials Management
- Heat Island Effect
- HEPA Filter
- Hierarchy of Controls
- High-Performance Building
- Hoshin Kanri
- Hot Desking
- Hoteling
- Human Factors
- HVAC (Heating, Ventilation, and Air Conditioning)
- HVAC Commissioning
- HVAC Load Calculation
- Hybrid Project Management
- Hybrid Structural System
- Hybrid Work Models
- Hydraulic Jacking
- IAQ
- IBC (International Building Code)
- IECC (International Energy Conservation Code)
- IEQ
- IFMA (International Facility Management Association)
- Impact Assessment
- Implementation Planning
- Incident Management
- Inclement Weather Delay
- Independent Cost Estimate (ICE)
- Individual Development Plan (IDP)
- Indoor Air Quality (IAQ)
- Indoor Environmental Quality (IEQ)
- Infrared Thermography
- Infrastructure Management
- Inspection and Test Plan (ITP)
- Inspection Checklist
- Integrated Master Schedule (IMS)
- Integrated Project Delivery (IPD)
- Integrated Workplace Management System (IWMS)
- Integrated Workplace Management System (IWMS)
- Interim Certificate of Occupancy (ICO)
- Internet of Things (IoT)
- Interpersonal Skills
- Intrusion Detection System
- Inventory Management
- IoT Sensors
- IREM (Institute of Real Estate Management)
- Irrigation System Commissioning
- IWMS
- Ladder Schedule
- Lag Time
- Last Planner System
- Leadership Coaching
- Leadership Development
- Lean
- Lean Construction
- Learning and Development
- LEED (Leadership in Energy and Environmental Design)
- LEED Certification
- Lessons Learned
- Lessons Learned Report
- Leveling Course
- Life Cycle Cost Analysis (LCCA)
- Life Safety Systems
- Liquidated Damages (LDs)
- Load-Bearing Wall
- Lockout/Tagout (LOTO)
- Luffing Jib Crane
- Maintenance Backlog
- Maintenance Management
- Maintenance Planning
- Make-Up Air Unit (MAU)
- Manhole
- Mass Timber Construction
- Master Planning
- Master Schedule
- Material Takeoff (MTO)
- Mechanical, Electrical, and Plumbing (MEP) Systems
- Mediation
- Mentoring
- Mentorship
- MERV Rating
- Micropiles
- Milestone
- Mission Statement
- Mitigation Plan
- Mobile Applications
- Modular Construction
- Monitoring-Based Commissioning
- Monolithic Slab
- Motivation Theory
- Musculoskeletal Disorders (MSDs)
- Nanotechnology in Construction
- Negative Float
- Negotiation Skills
- Net Present Value (NPV)
- Net Zero Energy Building (NZEB)
- NFPA (National Fire Protection Association)
- Noise Abatement
- Non-Conformance Report (NCR)
- Non-Destructive Testing (NDT)
- Not-to-Exceed (NTE) Contract
- Notice of Award (NOA)
- Notice to Proceed (NTP)
- Nuclear Density Test
- Objectives and Key Results (OKRs)
- Occupancy
- Occupancy Data
- Occupancy Permit
- Occupancy Rate
- Occupancy Sensor
- Occupant Apps
- Occupant Satisfaction
- Occupational Safety and Health Administration (OSHA)
- Off-Site Fabrication
- On-Site Concrete Batching
- Open Plan Office
- Operating Expenses (OpEx)
- Operational Efficiency
- Operational Excellence
- Operational Readiness
- Organizational Change Management
- Organizational Culture
- Organizational Development
- OSHA (Occupational Safety and Health Administration)
- Over-Excavation
- Overhead Costs
- Owner’s Project Requirements (OPR)
- Owner’s Representative
- Oxidation Protection Coating
- Pavement Management System (PMS)
- Payback Analysis
- Peer Coaching
- Penetration Seal
- Performance Appraisal
- Performance Bond
- Performance Coaching
- Performance Improvement Plan (PIP)
- Performance Management
- Performance Monitoring
- Performance Standards
- Permeable Paving
- Personal Protective Equipment (PPE)
- PESTEL Analysis
- Photovoltaic (PV) Panel Installation
- Pile Cap
- Pink Noise
- Plenum Space
- PMBOK (Project Management Body of Knowledge)
- PMI (Project Management Institute)
- PMP (Project Management Professional)
- Post Occupancy Evaluation (POE)
- PPE
- Predictive Maintenance
- Prefabricated Building Components
- Preventive Maintenance
- Procurement Plan
- Productivity
- Professional Development
- Project Charter
- Project Closeout
- Project Closeout Checklist
- Project Management
- Project Management Software
- Property Condition Assessment
- Psychological Safety
- Punch List
- Purpose-driven leadership
- Radiant Heating System
- RCRA (Resource Conservation and Recovery Act)
- Real Estate Management
- Rebar (Reinforcing Bar)
- Reclamation Project
- Recognition Programs
- Rectification Period
- Relative Compaction
- Relative Humidity
- Reliability-Centered Maintenance
- Remote Work
- Renewable Energy
- Repetitive Strain Injury (RSI)
- Request for Information (RFI)
- Request for Proposal (RFP)
- Resistance Management
- Retaining Wall
- Retro-Commissioning
- Return on Investment (ROI)
- RICS (Royal Institution of Chartered Surveyors)
- Risk Assessment
- Risk Management
- Risk Management Plan
- Risk Mitigation Plan
- Risk Register
- Rites and rituals
- Roadway Expansion Joint
- Root Cause Analysis
- RPA (Real Property Administrator)
- Safety Culture
- Safety Data Sheet (SDS)
- Safety Management System
- Safety Protocols
- SBS
- Scaffolding Erection Plan
- Scenario Planning
- Schedule Baseline
- Scope Creep
- Security Systems
- Self-Consolidating Concrete (SCC)
- Sensitivity Analysis
- Service Level Agreement (SLA)
- SFP (Sustainability Facility Professional)
- Sheet Piling
- Shotcrete
- Sick Building Syndrome (SBS)
- Situational Awareness
- Situational Leadership
- Skill Assessment
- Slump Test
- Smart Building
- Smart Building Technology
- SMART Goals
- Social impact
- Soil Nailing
- Sound Masking
- Sound Transmission Class (STC)
- Space Management
- Space Management Software
- Space Planning
- Space Utilization
- Space Utilization Studies
- Speech Privacy
- Stakeholder Analysis
- Stakeholder capitalism
- Stakeholder Engagement
- Stakeholder Management
- Stakeholders
- Standard Operating Procedures (SOPs)
- Strategic Alignment
- Strategic Objectives
- Strategic Planning
- Strategy Deployment
- Subculture
- Substantial Completion
- Succession Planning
- Survey Platforms
- Sustainability
- Sustainability Reporting
- SWOT Analysis
- Symbolism
- System Integration
- Takeoff Sheet
- Task Lighting
- Team Building
- Team Development
- Team Dynamics
- Team Performance
- Technology Integration
- Telework
- Tender Document
- Tendinitis
- Tensile Strength
- Thermal Bridging
- Thermal Comfort
- Thermal Imaging
- Thermal Stratification
- Tilt-Up Construction
- Time and Materials (T&M) Contract
- Time Value of Money
- Topographic Survey
- Total Cost of Ownership (TCO)
- Total Quality Management
- Transformational Leadership
- Transition Management
- Trenchless Technology
- Trust Building
- TSCA (Toxic Substances Control Act)
- Turnkey Project
- Value Chain
- Value Engineering (VE)
- Values
- Values Alignment
- Values Assessment
- Values Communication
- Values Integration
- Values Misalignment
- Values Role Modeling
- Values Sustainment
- Values Training
- Values-Based Decision-Making
- Values-Based Hiring
- Values-Based Recognition
- Values-Driven Leadership
- Vapor Barrier
- Variance Analysis
- VAV (Variable Air Volume)
- Vendor Management
- Vendor Selection
- Vent Stack
- Vertical Integration
- Vision Alignment
- Vision Communication
- Vision Statement
- Visioning Process
- Visioning Workshops
- Visitor Management System
- Void Form
- Volatile Organic Compounds (VOCs)
- Vulnerability Assessment
- Waiver of Lien
- Walkthrough Inspection
- Warranty Management
- Waste Management
- Water Conservation
- Water-Cement Ratio
- Wayfinding
- Weather-Resistant Barrier (WRB)
- Welded Wire Fabric (WWF)
- WELL Building Standard
- Wetlands Mitigation
- White Noise
- Work Breakdown Structure (WBS)
- Work Order Management
- Work-Life Balance
- Workflow Automation
- Working Drawings
- Workplace Coaching
- Workplace Conflict
- Workplace Strategy
- Workplace Wellbeing

