- Balanced Scorecard
- BAS
- Baseline
- Baseline Schedule
- Benchmarking
- Benchmarking
- Best Practices
- Bid Bond
- Bill of Quantities (BOQ)
- BIM
- BIM (Building Information Modeling)
- Biophilia
- Biophilic Design
- Blue Ocean Strategy
- Bottom-Up Estimating
- Breakout Area
- Budget Contingency
- Budget Overrun
- Buildability Analysis
- Building Automation System (BAS)
- Building Envelope
- Building Envelope
- Building Information Modeling (BIM)
- Building Management System (BMS)
- Building-Related Illness (BRI)
- Business Continuity Management
- Business Impact Analysis
- Buyout Phase
- CAFM
- Capital Expenditure (CAPEX)
- Capital Planning
- Carbon Dioxide (CO2) Monitoring
- Carpal Tunnel Syndrome
- Cascading Objectives
- Cash Flow Forecasting
- Catchball
- Change Control Process
- Change Management
- Change Management
- Change Order
- Churn Rate
- Circadian Lighting
- Clash Detection
- Closeout Report
- Collaborative Space
- Color Rendering Index (CRI)
- Commissioning
- Commissioning (Cx)
- Competitive Advantage
- Computer-Aided Facility Management (CAFM)
- Computerized Maintenance Management System (CMMS)
- Conceptual Estimate
- Constructability Review
- Construction Contingency
- Construction Documentation
- Contract Closeout
- Core Competencies
- Core Values
- Corrective Maintenance
- Correlated Color Temperature (CCT)
- Cost Baseline
- Cost Breakdown Structure (CBS)
- Cost Estimating
- Counterculture
- Critical Chain Method (CCM)
- Critical Path Method (CPM)
- Cultural assessment
- Cultural audit
- Culture
- Cut and Fill
- Daily Report
- Defect Liability Period (DLP)
- Deferred Maintenance
- Delay Analysis
- Deliverables
- Demand-Controlled Ventilation
- Design Intent
- Design-Bid-Build (DBB)
- Design-Build (DB)
- Deviation Report
- Digital Twin
- Digital Twin
- Disaster Recovery Plan
- Dispute Resolution Board (DRB)
- Disruptive Innovation
- Diversification
- Downtime
- Draw Request
- Earned Schedule (ES)
- Earned Value (EV)
- Economic Life
- Emergency Response Plan
- Energy Modeling
- Environmental Impact Assessment (EIA)
- Environmental sustainability
- Equipment Utilization Rate
- Ergonomic Assessment
- Ergonomic Risk Factors
- Ergonomics
- Escalation Clause
- Escrow Account
- Espoused values
- Expected Monetary Value (EMV)
- Facilities Maintenance
- Facility Condition Assessment
- Facility Condition Index (FCI)
- Facility Management
- Fast-Tracking
- Feasibility Study
- Feathering Delay
- Field Order
- Final Inspection
- Fire Rating
- Fire Safety System
- Flexible Seating
- Float Path
- Foot-candle
- Force Account Work
- Foreman’s Daily Log
- Functional Performance Testing (FPT)
- IAQ
- IEQ
- Impact Assessment
- Inclement Weather Delay
- Independent Cost Estimate (ICE)
- Indoor Air Quality (IAQ)
- Indoor Environmental Quality (IEQ)
- Inspection and Test Plan (ITP)
- Inspection Checklist
- Integrated Master Schedule (IMS)
- Integrated Project Delivery (IPD)
- Integrated Workplace Management System (IWMS)
- Interim Certificate of Occupancy (ICO)
- Internet of Things (IoT)
- Intrusion Detection System
- Irrigation System Commissioning
- IWMS
- Objectives and Key Results (OKRs)
- Occupancy
- Occupancy Permit
- Occupancy Rate
- Occupancy Sensor
- Occupational Safety and Health
- Occupational Safety and Health Administration (OSHA)
- Off-Site Fabrication
- On-Site Concrete Batching
- Open Plan Office
- Operational Efficiency
- Operational Readiness
- Organizational Culture
- Over-Excavation
- Overhead Costs
- Owner’s Project Requirements (OPR)
- Owner’s Representative
- Oxidation Protection Coating
- Pavement Management System (PMS)
- Penetration Seal
- Performance Bond
- Permeable Paving
- Personal Protective Equipment (PPE)
- PESTEL Analysis
- Photovoltaic (PV) Panel Installation
- Pile Cap
- Pink Noise
- Plenum Space
- Post Occupancy Evaluation (POE)
- PPE
- Prefabricated Building Components
- Preventive Maintenance
- Procurement Plan
- Productivity
- Project Charter
- Project Closeout Checklist
- Punch List
- Purpose-driven leadership
- Radiant Heating System
- Rebar (Reinforcing Bar)
- Reclamation Project
- Rectification Period
- Relative Compaction
- Relative Humidity
- Remote Work
- Repetitive Strain Injury (RSI)
- Request for Information (RFI)
- Retaining Wall
- Risk Assessment
- Risk Management Plan
- Risk Mitigation Plan
- Risk Register
- Rites and rituals
- Roadway Expansion Joint
- Safety Culture
- Safety Data Sheet (SDS)
- SBS
- Scaffolding Erection Plan
- Scenario Planning
- Schedule Baseline
- Scope Creep
- Self-Consolidating Concrete (SCC)
- Sheet Piling
- Shotcrete
- Sick Building Syndrome (SBS)
- Situational Awareness
- Slump Test
- Smart Building
- Social impact
- Soil Nailing
- Sound Masking
- Sound Transmission Class (STC)
- Space Management Software
- Space Planning
- Space Utilization
- Speech Privacy
- Stakeholder Analysis
- Stakeholder capitalism
- Stakeholders
- Strategic Objectives
- Strategic Planning
- Strategy Deployment
- Subculture
- Substantial Completion
- Sustainability
- SWOT Analysis
- Symbolism
- Value Chain
- Value Engineering (VE)
- Values
- Values Alignment
- Values Assessment
- Values Communication
- Values Integration
- Values Misalignment
- Values Role Modeling
- Values Sustainment
- Values Training
- Values-Based Decision-Making
- Values-Based Hiring
- Values-Based Recognition
- Values-Driven Leadership
- Vapor Barrier
- Variance Analysis
- Vent Stack
- Vertical Integration
- Vision Alignment
- Vision Communication
- Vision Statement
- Visioning Process
- Visioning Workshops
- Visitor Management System
- Void Form
- Volatile Organic Compounds (VOCs)