Magazine

FM College ~ News & Articles

Virtualize Your Substations?

Jan 24, 2024 | Public | 0 comments

A virtualized, cloud-based approach to design can cut costs and simplify replication.

The future of power-system substation design may be redefined by using virtualization technology. The primary benefit will be a significant reduction in hardware. Instead, tasks will be carried out on cloud servers, marking a noticeable shift from the current reliance on extensive racks of hardware. The appeal for utilities is the significant cost reduction for substation design and engineering, reduced use of copper wiring, and the ability to easily replicate designs for future expansions.

“Consider that today’s substation can have 200 or more independent [hardware] boxes each performing a dedicated task,” stated Jeremy Anderson, Senior Vice President of Product Development at NovaTech Automation, Quakertown, PA (novatechautomation.com/solutions/substation-automation). “That’s a tremendous amount of wire to pull, hardware to maintain, and it continues to become more and more congested. In a virtual digital substation, two or three servers run everything.”

With a vision for an intelligent grid of the future that is adaptive and resilient requiring less hardware and leveraging more virtualization, the utilities industry has formed the Virtual Protection and Control Alliance (vPAC Alliance, vpacalliance.com) to explore how to do this. The focus is to accelerate the creation of a standards-based, open, interoperable, and secure architecture to host protection, automation, and control solutions for power-system substations. NovaTech is one of more than 20 member organizations.

“From our standpoint, we wanted to help define the future of substation automation,” said Anderson. With this in mind, NovaTech has spent the past year creating a virtual version of its Orion Substation Automation Platform to run on any server. The system uses a host machine known as a hypervisor and servers powered by Intel CPUs.

The company’s flagship product, the Orion, is a communication and automation processor that can connect to nearly any substation device in its native protocol, perform advanced math and logic, and securely present the source or calculated data to any number of clients in their own protocol.

The Orion can be integrated with any equipment and is often connected to microprocessor-based relays, meters, event recorders, IEDs, and RTUs. It is then connected to an existing enterprise network or SCADA system.

Using virtual designs for utilities can significantly reduce hardware by moving tasks to cloud servers.

An emerging model

According to Anderson, there is a coordinated push by some large investor-owned utilities to move to what is being called the “digital substation.” Still, not all utilities are ready to pull the plug on the traditional substation design. “Most utilities aren’t moving in this direction at this point,” explained Anderson. “But they are certainly investigating it thoroughly with the plan to move in this direction in the coming years.”

Cost savings is a leading driver. “It is a lot less expensive to build multiple substations once a virtual design is established because you’re not pulling tons of copper wire everywhere,” said Anderson. “When it is based on the ethernet, you can build a substation that is somewhat cookie-cutter in design and easily replicated. This represents a significant cost saving in substation design and engineering

The cost outlay for hardware is also reduced. “Consider that two or three servers that cost $10,000 each can potentially replace as many as 200 hardware devices that average $10,000 per device. The savings are significant, even if you factor in licensing fees for virtual machines,” added Anderson.

Recent supply-chain challenges are also increasing the appeal of hardware-agnostic solutions. “The pandemic certainly tested the supply chains in our sector,” said Anderson. “There were massive issues around the world trying to buy hardware, especially custom-built devices. With virtualization, if a server ever fails, it is easier to find a replacement and the utility is not limited to proprietary hardware.”

Designing a virtual system

In creating the virtual Orion, NovaTech wanted to ensure the system functioned identically to its hardware-based system. “The biggest challenge was taking a system that was developed over many years as embedded software for purpose-built hardware and making it run on any server,” said Anderson. He added that, in some ways, it was easier than initially thought. “The virtual Orion looks and operates the same as every unit we have sold. It just happens to run on hardware that we didn’t build,” explained Anderson.

The virtual Orion system is currently in beta test at a utility in Arizona with the full release planned in February. The company plans to debut it at the DISTRIBUTECH conference, Feb. 26 to 29, in Orlando, an annual event for showcasing cutting edge technologies in power transmission and distribution.

Looking ahead

“We are still in the early days of the deployment of virtual digital substations,” said Anderson. “There are some early adopters, but I anticipate that we are at least five years away from broad-based market adoption.”

However, there is an opportunity to solve a more immediate issue in substation environments. As more IoT devices are installed in utility distribution systems, a single virtual Orion on a server could be used to collect and manage data from thousands of sources. When all these devices must be hardwired, it can take several racks to collect all the data.

With cloud computing and virtualization changing the contours of many industries, momentum continues to build behind virtualizing more of the work of a substation. The blueprint for tomorrow’s power-system substation has yet to be fully written, but it is only a matter of time before we will see more virtual environments emerge through the collective expertise of industry stakeholders.

For more information, visit novatechautomation.com/solutions/substation-automation

Gary Parr | January 24, 2024

The post "Virtualize Your Substations?" appeared first on Efficient Plant

0 Comments

Submit a Comment

What Facilities Managers Should Know About Wellness Rooms

Facilities managers (FMs) should consider adding wellness rooms when renovating or constructing new facilities so that...

Cleveland Clinic and Cavaliers Break Ground on New Facility

The Cleveland Clinic Global Peak Performance Center will provide care both to Cavaliers players and the general public. The...

Know Your Data to Harness Federated Machine Learning

Sam Falconer/theispot.com Nowadays, deploying artificial intelligence no longer guarantees a competitive edge. What truly...

The Future of Business Surveillance: Exploring Innovative Security Camera Solutions

For organizations of any size to reliably protect people, property, and valuable information from malicious actors,...

PeaceHealth Unveils Plans for Timber Springs Behavioral Health Hospital